Sunday, March 13, 2022

Have your say on Lilyfield Skatepark by 28 March 2022.

 Have your say on Lilyfield Skate Park. 

Final day for submissions is Monday, 28 March 2022. https://yoursay.innerwest.nsw.gov.au/lilyfield-skate-plaza

 

Trees

source: Lilyfield Skate Plaza - Final Arboricultural Report.pdf (2.93 MB) (pdf)

 Drainage and Flooding

"The design is required to achieve certification by a suitably qualified structural engineer.

 
Certification by a suitably qualified structural or geotechnical engineer will also be required to confirm the proposed works will not have any adverse impact on the stability of the adjacent sea wall during construction or operation.
 

A number of features are recommended to be incorporated into the design to reduce the impacts of foreshore flooding including flood signage, waterproofing of electrical services and the provision of drainage non-return valves." - document icon Lilyfield Skate Plaza"

p76, Review of Environmental Factors.pdf (4.22 MB) (pdf), https://yoursay.innerwest.nsw.gov.au/lilyfield-skate-plaza

Wetland?

"The concrete skate park will add approximately 600m2 of impervious surface to the site.

An existing 450 mm diameter pipe traverses through the south-western corner of the development area and connects to a twin 450 mm square grated surface inlet pit on the eastern side of Maliyawul Street.
This drainage line outlets to Parramatta River at the sea wall via a 450 mm diameter pipe crossing Maliyawul Street

It is recommended that flood signage is provided to caution against entry into the skate park when floodwaters are present.

Proposed site electrical services that are below the 100 year ARI foreshore flood level will require suitable waterproofing. " 

- Lilyfiled Skate Plaza - Final Foreshore Risk Management.pdf (14.9 MB) (pdf)

Public Transport

Source: Lilyfield Skate Plaza - Final Traffic Impact Assessment.pdf (2.76 MB) (pdf)

 

Council Minutes 8 December 2020

C1220(1) Item 11         Notice of Motion to Rescind: C1120(1) Item 3 Adoption          Leichhardt Park Plan of Management - 10 November 2020

Motion: (Stamolis/Da Cruz)
THAT Council rescind C1120(1) Item 3 Adoption Leichhardt Park Plan of Management.

Motion Carried
For Motion:     Crs Da Cruz, Hesse, Kiat, Macri, Passas, Porteous, Stamolis and Steer
Against Motion:          Crs Byrne, Drury, Iskandar, Lockie, McKenna OAM and York

Motion: (Stamolis/Da Cruz)
THAT:
1.    Council find a more suitable location for the skate park in Leichhardt Park;
2.    Council consult with the community about options for a new location for the skate park;
3.    A new location for a skate park be assessed by way of a standard Development Application process to allow full community participation; and
4.    Council readopted the Leichhardt Park Plan of Management without the Skate Park.

Motion Lost
For Motion:     Crs Da Cruz, Macri, Passas and Stamolis
Against Motion:          Crs Byrne, Drury, Hesse, Iskandar, Kiat, Lockie, McKenna OAM, Porteous, Steer and York

 
Foreshadowed Motion (Byrne/Porteous)

THAT:
1.    The Plan of Management for Leichhardt Park be readopted by Council with the requirement that the development assessment of the Skate Park is assessed to the same level as a Development Application. This assessment will require that the environmental assessment and public participation for the skate park assessment must be at least the same as the requirements for a Part 4 Development Application, therefore ensuring the community is consulted and able to make submissions. The location of the Skate Park should be retained in Leichhardt Park; and

2.    The matter be reported back to Council after the assessment.

Motion Carried
For Motion:     Crs Byrne, Da Cruz, Drury, Hesse, Iskandar, Kiat, Lockie, Macri, McKenna OAM, Porteous, Steer and York
Against Motion:          Crs Passas and Stamolis

The Mayor, Councillor Byrne retired from the meeting and vacated the chair at 10:09pm and the Deputy Mayor, Councillor Macri assumed the chair.


Minutes 10 November 2020

https://innerwest.infocouncil.biz/Open/2020/11/C_10112020_MIN_3759_WEB.htm

C1120(1) Item 3            Adoption Leichhardt Park Plan of Management

Motion: (Byrne/Drury)
THAT Council adopt the Leichhardt Park Plan of Management as pursuant to Section 40 of the Local Government Act 1993 in accordance with 3.23(6) of the Crown Lands Management Act 2016.

Motion Carried
For Motion:                 Crs Byrne, Da Cruz, Drury, Hesse, Iskandar, Kiat, Lockie, Macri, McKenna OAM, Raciti, Steer and York
Against Motion:          Crs Passas and Stamolis
Absent:                        Cr Porteous
 
Amendment (Stamolis)
THAT the location of a skate park must be selected on the basis of local community support.

The Mayor ruled this Out of Order as the location of the skate park is identified in the Plan of Management.

Amendment (Da Cruz/Steer)
THAT the reference to converting Leichhardt Oval Number 2 to a synthetic surface be deleted.

Motion Lost
For Motion:                 Crs Da Cruz, Hesse and Steer
Against Motion:          Crs Byrne, Drury, Iskandar, Kiat, Lockie, Macri, McKenna OAM, Passas, Raciti, Stamolis and York
Absent:                        Cr Porteous