Saturday, March 19, 2022

Bignell Lane, Annandale (formerly Camperdown)

"Short-term closure and permanent reconfiguration of Bignell Lane, but lane access maintained during construction period "-Inner West Council Presentation to 14 Feb 2018 meeting ANNANDALE-CAMPERDOWN https://www.innerwest.nsw.gov.au/ArticleDocuments/1627/Presentation%20to%2014%20Feb%202018%20meeting%20ANNANDALE-CAMPERDOWN%20for%20web.pdf.aspx
  1. Pyrmont Bridge Road Compound Historical Archaeological Research Design and Excavation Methodology Project: Westconnex 3A Construction Date: 02 August 2018 https://www.westconnex.com.au/media/dz3htlae/m4-m5-link-tunnels_pyrmont-bridge-road-hardem.pdf 
    • "The area between Mallet Street and Pyrmont Bridge Road included Bignell and Clark’s Camperdown steam joinery works. Bignell Lane is named after the Bignell family.
      ‘Florenceville’ was located to the east of Bignell and Clark’s Camperdown steam joinery works and occupied by the Pritchard family since at least 1880"..
    • "In c1930, Morris (NSW) Limited set up a garage and motor works on corner of Pyrmont Bridge Road and Bignell Lane. On the western side of Bignell Lane, the land was still unoccupied, however, between Pyrmont Bridge Road, George Road and Parramatta Road, the workshops, blacksmith and cottages had been replaced by a series of small warehouses."
    • "Table 1: Summary of archaeological potential and significance in HAMU 10 and 11 HAMU 10 Bignell Lane"
  2. "E48 Bignell Lane, Camperdown, must be reinstated to its preimpact alignment and length prior to operation, unless otherwise approved by the Secretary following consultation with the relevant council" NSW Government 45
    Department of Planning and Environment
    Conditions of Approval for WestConnex M4-M5 Link SSI 7485
    SSI 7485 MOD 1 determined 25 February 2019 https://www.westconnex.com.au/media/0zrddbng/westconnex-m4-m5-link-mod-1_consolidated-instrument-of-approval.pdf
  3. Realigned Bignell Lane opened to traffic -Roads and Maritime Services WestConnex, Community Reference Group New M5 and M4-M5 Link Tunnels Tuesday 12 November 2019 https://www.westconnex.com.au/media/c5dktdcq/wcrg-m4-m5-link-and-m8-round-4-presentation-12-november-2019.pdf
  4. "Bignell Lane, Camperdown, must be reinstated to its preimpact alignment and length prior to operation, unless otherwise approved by the Secretary following consultation with the relevant council." Staging Report, M4-M5 Link Project,Transport for New South Wales | February 2021https://www.westconnex.com.au/media/te3fe11e/m4-m5-link-staging-report_rev-04.pdf
  5. Parking on the Footpath of the reconfigured Bignell lane15 Feb 2022




     



No comments:

Post a Comment

Inner West council meeting Questions on Notice

Questions on Notice (QoN) for April 2024 Agenda, the next council meeting. Questions on Notice From Councillor Marghanita da Cruz Questi...